Wednesday, 9.00pm
The management and the committee had decided to conduct a corridor light-up lighting testing.
The main reason behind this test is to find out ways to help reduce the monthly electricity usage at our Condo (Our average usage is RM5000)
During this test, the committee found out that there are 2 switches that controls the corridor lightings for each block.
At Block A
When all the lights light up.
Switch 1 is turn off.
and when switch 2 is turn off... The following view can be seen.
One side of the staircase is totally dark and very dangerous. Due to safety concern, the committee decided to turn off switch 1 after 12 midnite everyday.
One side of the staircase is totally dark and very dangerous. Due to safety concern, the committee decided to turn off switch 1 after 12 midnite everyday.
Block B when fully light-up
and when Switch 2 is turn off, the following view can be seen....
We can see that Switch 2 turns off more lights and is turns the building into very dark condition... The committee finally decided to turn off Switch 1 around 11pm because Switch 1 lightings does not affect the lightings condition in Block B...
We can see that Switch 2 turns off more lights and is turns the building into very dark condition... The committee finally decided to turn off Switch 1 around 11pm because Switch 1 lightings does not affect the lightings condition in Block B...
Hopefully, we can see some reduction is the electricity consumption at our condo.. Will update you all with the savings....